Prev
Next

Project

BAGG is currently involved in projects with schools, CALTRANS, local governments, high tech and biotech firms, and commercial/residential developers.

Representative Projects

BAGG has been involved with a number of projects in the Bay Area and elsewhere, some of which include:

  • Geotechnical investigation & Observation/Teseting Services During Construction, @ First Project, SE Corner of N. First Street @ HWY 237, San Jose, California, Construction of four 7-story, one 4-story, and major and minor retail buildings (4/2007 to present), For Hunter Properties.
  • Geologic & Geotechnical Investigation, Geotechnical Observation/testing and Special Inspection Services, Skycrest Subdivision, SE Corner of San Bruno Avenue at Glenview Drive, San Bruno, California, a 27-lot residential subdivision with the houses supported on post-tensioned slabs (2003-present), For Kenmark Real Estate Group.
  • Geotechnical Investigation, Probabilistic Seismic Hazard Analysis, and Geotechnical Observation during Construction of New Base-Isolated Manufacturing Building, Vacaville, California (2004 to 2005), For Flour NE, Inc.
  • Geotechnical Investigation and Observation/Testing Services During Construction of 1.5 Million Gallon, 90-foot Diameter, Below-Grade Water Tank and Construction of 100-foot High Fill Disposal Embankment, Los Gatos California (2003 to Present), For Private Landowner.
  • Geotechnical Investigation, Hydrogeologic Study, and Observation/Testing During Construction, Proposed 10 Acre-Foot Fish Pond, Buffalo Valley Ranch, San Mateo County, California (2002 to 2006), For Private Landowner.
  • Geotechnical Investigation and Observation/Testing During Construction of Pillar Point Harbor Village, New Hotel, Retail Shops, and Under-Ground Parking Garage, Princeton By the Sea, California (2001 to present), For Pillar Point, LLC.
  • Geotechnical Investigation and Observation/Testing Services During Construction of 3, Five-Story Office Buildings, South San Francisco, California (2000 to present), For Genentech, Inc.
  • Geotechnical Investigation and Observation/Testing Services During Construction, Founders Research Center II Project, South San Francisco, California (1999-2004), For Genentech, Inc.
  • Geotechnical Investigation and Observation/Testing During Construction of New Student Housing and Technology Center, Notre Dame de Namur University, Belmont, California (1997 to 2003), For Notre Dame de Namur University.
  • Geotechnical Investigation and Observation/Testing Services for Various Roadway Improvement and Pavement Rehabilitation Projects and Underground Utility Construction within the Stanford University Campus (over 100 projects since 1995), for Stanford University Utilities Division.
  • Geotechnical Observation & Testing Services, Various Public Works Projects (1990-Present), yearly contracts with the County of San Mateo.
  • Geotechnical Investigation, Proposed 77-Lot, Peachtree Subdivision – Unit III, Live Oak, California (2004), For Ryland Homes.
  • Geotechnical Investigation, New Wine Caves and Processing Building, Rhys Vineyards, Santa Clara County, California (2004), For Nordby Wine Caves.
  • Geotechnical Investigation of Bay Mud Ground Failure Beneath Bauxite Stockpile, Port of Redwood City, Redwood City, California (2004), For the Port of Redwood City.
  • Geotechnical Investigation and Evaluation of Farm Hill Landslide, Redwood City, California (2004), For the City of Redwood City.
  • Geotechnical Investigation and Observation/Testing During Construction of New Target Store, Westfield Shoppingtown Oakridge, San Jose, California (2003 to 2004), For the Target Corporation.
  • Geotechnical Investigation, Probabilistic Seismic Hazard Analysis, and Observation/Testing During Construction of Manufacturing Building Seismic Retrofit, South San Francisco, California (2003 to 2004), For Genentech, Inc.
  • Geotechnical Investigation and Observation/Testing During Construction of New Two-Level Mall Expansion and 2, Four-Level Parking Structures, Westfield Shoppingtown Oakridge, San Jose, California (2001 to 2004), For Westfield Corporation, Inc.
  • Geotechnical Investigation and Observation/Testing During Construction of Foothill Reservoir No. 2, Stanford University, California (a 7 million-ga domestic water supply reservoir in the foothills south of campus) (1999-2000), for Stanford University Facilities Operations, Utilities Division, Civil-Infrastructure Group.
  • Geotechnical Investigation and Observation Testing Services During Construction, New 3-Story Office & 2-Level Parking Deck, 395 Page Mill Road, Palo Alto, California (1998-2000), For Hewlett-Packard Company (Now Agilent Technologies Headquarters).
  • Phase I Environmental Assessment, Geotechnical Investigation, and Observation and Testing Services During Construction, Ritz-Carton Half Moon Bay Resort (a 6-level hotel structure and a 2-level parking garage), West End of Fairway Drive, Half Moon Bay, California (1997-2000), For The Athens Group.
  • Soil Investigation, Redwood Shores Levee Segment III Improvements Project, Involving Stability Analysis of Various Dikes, Earth-Fill Levees, and Concrete Flood Walls (2001-2002), for the City of Redwood City.
  • Geotechnical Investigation and Observation/Testing Services During Construction, New 5-Story Office Building supported on 50- to 90-foot vibration-free Tubex piles, South San Francisco, California (1999-2202), For Genentech, Inc.
  • Geotechnical Investigation and Observation/Testing Services During Construction of Bair Island Marina and Eight, 4-Story, pile-0supported apartment buildings, Redwood City, California (1997-2000), for Irvine Apartment Communities.
  • Phase I Environmental Assessment, Geotechnical Investigation, and Observation and Testing Services During Construction, Ritz-Carton Half Moon Bay Resort (a 6-level hotel structure and a 2-level parking garage), West End of Fairway Drive, Half Moon Bay, California (1997-2000), For The Athens Group.
  • Soil Investigation, Redwood Shores Levee Segment III Improvements Project, Involving Stability Analysis of Various Dikes, Earth-Fill Levees, and Concrete Flood Walls (2001-2002), for the City of Redwood City.